|
Products - Maxi Range 41PE to 180PE
HOW IT WORKS
The Biofilter works in conjunction with a Primary Settlement Tank.
From here partially treated effluent enters the baffle zone where two irrigation pumps are used to spray the liquid over the media via the distributor. This process is repeated until eventually the effluent is allowed to settle in the final settlement zone from where it is discharged at a standard to satisfy the Environment Agency.
A secondary sludge return pump periodically removes dead bacteria by returning it to the primary settlement tank, where it is stored until removed by the tanker.
TEN GOOD REASONS
- Very competitively prices. Probably the most realistically priced unit on the market.
- Designed to BS 6297 - Design and installation of small sewage treatment works.
- Constructed of high quality Glass Fibre.
- Superior Grundfos pumps and efficient random media.
- Single phase. Three phase optional.
- 3 year warranty on working parts.
- Simple installation. The bottom sump is installed whilst the filter unit locates on top of the sump.
- Commissioning and the first two services free.
- Sample Chamber, Grease Trap and Pump Stations optional extras if required.
- Maintenance Service Available
|